Alliance Acoustical Consultants, Inc.
 
 Alliance Acoustics .com 
1-800-NOISE-18
1-800-664-7318
 Return to Main Navigation 
 Return to Industrial Noise Control 
  Services 2
INDUSTRIAL NOISE continued - Permitting Support

 
Facility Permitting Support - Alliance Acoustical Consultants, Inc. (AAC) has been involved with many industrial projects during the permitting and environmental assessment phases. Our involvement has typically included conducting community noise ambient surveys; supplying engineering data on the predicted equipment noise emissions; analyzing and modeling future noise levels from the facility; writing formal application documentation; and/or attending workshops and hearings conducted by regulatory agencies.

Representative permitting projects include:

California:
      Morro Bay Power Plant (DENA)¹
      Colusa Power Plant (Reliant)
      Avenal Power (DENA)
      Tesla Power (FPL)
      MountainView (Thermo Ecotek/AES)
      High Desert Power (HDPP)
      Moss Landing Power (DENA)
      Rio Linda Power (FPL)
      El Cajon (CalPeak)
      Mission (CalPeak)

Washington:
      Pierce County Power (MEGA/Frederickson)
      Grays Harbor I & II (Energy NorthWest/DENA)

Nevada:
      Moapa Power (DENA)

Pennsylvania:
      Seward Repowering Plant (Reliant)
      Liberty Power (Reliant)

South Carolina:
      Urquhart Repowering Plant (Reliant)
      Anderson Power (FPLE)

Arizona:
      Gila River Power (Panda)

Montana:
      Silver Bow Power

New Hampshire:
      Newington Power (ConEd)

Indonesia:
      Banyu Urip Oil/Gas Production, Processing and Pipeline Facility (Exxon-Mobil)

Texas:
      Forney Power (FPLE)

Florida:
      Martin Power (FPL)

¹Including testimony before the California Energy Commisson (CEC)

 Home  |   Aircraft & Airport Noise  |   Architectural/Building Acoustics  |   Environmental Noise  |   Industrial Noise  |   Noise Design Engineering  |   Power Plant Noise Permitting  |   Retrofit Noise Control  |   Bellingham CO2 Project  |   Brasil Power Plant Evaluation  |   Liberty Electric Evaluation  |   Mission Peaking Plant  |   Morro Bay Power Plant  |   Newington Energy  |   Riyadh Refinery Evaluation  |   Seward Coal Plant  |   Pringles Packaging Noise Control  |   Railroad Noise  |   Traffic Noise  |   Vibration Evaluation  |   AAC History  |   Engineering Philosophy  |   Teaming  |   Work Practices  |   Site Map  |   Contact Us 
 Return to Main Navigation 
 Return to Industrial Noise Control 
© 2005 Alliance Acoustical Consultants, Inc.  |  AllianceAcoustics.com  |  AllianceAcoustical.com